STEM & Academic Program Enhancements

Many of the science labs on campus are more than 25 years old. Proposition Community College is helping modernizing our current spaces and expand lab space on campus. Prop CC is also being used to purchase state-of-the-art equipment to best prepare students for the future.

Project List and/or description of projects

St. Charles Community College will renovate the current Café-Bookstore Building to create at least five new science labs along with additional classrooms, offices and student study areas. The renovation will create a more expansive learning environment for our students while also creating the potential for growth in STEM programs. 

View PDF of current plans.

Aug. 2021 - STEM Lab Renderings (DRAFT)

Timeline

  • April 2021 - Programming 
  • April 2021 - Schematic Design 
  • June 2021 - Design Development 
  • Aug. 2021 - Construction Documents 
  • Sept. 2021 - Bidding for General Contractor 
  • Nov. 2021- Construction Begins
  • July 2022 - Construction Complete
  • Aug. 2022 - Classes begin in new Life Science building
     

Budget

$5,000,000

Professional Services Team

St. Charles Community College has selected SSC Engineering, Chesterfield and Aspire Construction as the General Contractor to build and to help design the new labs on campus. 

2021

Task Force Agenda

2021

2020

Photo Gallery

Life Sciences Building

Demolition
IMG_1196.JPG IMG_1203.JPG IMG_1204.JPG IMG_1205.JPG IMG_1206.JPG IMG_1207.JPG IMG_1228.JPG IMG_1229.JPG IMG_1230.JPG IMG_1232.JPG IMG_1234.JPG IMG_1235.JPG IMG_1251.JPG IMG_1252.JPG IMG_1253.JPG IMG_1254.JPG IMG_1255.JPG
Construction
Furniture being moved into the Science Labs

science lab furniture.jpg

Deionization tank installed

IMG_2806.jpg

Metal cabinets installed

IMG_2805.jpg

IMG_2803.jpg

IMG_2799.jpg

Biosafe cabinet installed

Thumbnail_IMG_2933.jpg

ERV system installed

Thumbnail_IMG_2767.jpg

Thumbnail_IMG_2762.jpg

Cabinets, Countertops, Ceiling tiles installed and Carpet and flooring complete

0M3A0988.JPG
0M3A0987.JPG
0M3A0986.JPG
0M3A0984.JPG
0M3A0983.JPG
0M3A0989.JPG
0M3A0985.JPG
May 2022
Slide1_G.JPG
Slide2_H.JPG
Slide3_I.JPG
Slide4_J.JPG
Slide5_K.JPG
LS - Overheead Utilities.JPG
LS - Floor Prep.JPG
LS - Floor 1st & 2nd coat.JPG
LS - Finished Epoxy Floor.JPG
BSL 22.03.25 Main Hall.JPG
Science Labs - pic 22.03.25 prep space a.jpg
Science Labs - pic 22.03.25 prep space.JPG
SL 22.03.25 AP Lab.JPG
SL 22.03.25 Front lobby.JPG
Floor cutting for new utilities
IMG_1267.JPG
Building trenches for new utilities
IMG_1308.JPG IMG_1316.JPG IMG_1317.JPG IMG_1318.JPGSL Main hall way framed and dry wall started.jpg SL Main hall way framed and dry wall started 1.jpg BSL2 Lab walls framed out.jpg
Completion

Grand Openings and Ribbon Cutting Ceremonies Held Friday, October 14, 2022.

P1003220_small.jpg
P1003240_small.jpg
Life Sciences Renovations Complete. First Classes Held Fall 2022 Semester.
Image3_RT.jpg
Image8_RT.jpg
P1010300_RT.jpg
P1010301_RT.jpg
P1010302_RT.jpg
P1010303_RT.jpg
P1010304_RT.jpg
Room 130.jpg
Room 130 Vert.jpg
P1010301_RT.jpg
P1010300_RT.jpg
Common Area.jpg
BSL Prep.jpg
BSL lab.jpg
Breakout Area.jpg

SCC Main

Before

SCC Main 2111

2111.jpg

2111(2).JPG

SCC Main 2412

2412(2).jpg

2412.JPG

SCC Main 2413

2413.jpg

2413(2).jpg

SCC Main 2414

2414(2).jpg

2414.jpg

SCC Main 2417

2417.jpg

2417(2).jpg

Completion
SLC_1.png
SLC_2.png
SLC_3.png
SLC_4.png
SLC_5.png
SLC_6.png

Project Updates